Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online yesterday at 08:22

Candidate

Male, 51 year, born on 4 December 1973

Considers offers

Almaty, willing to relocate (Astana, Other regions, Tashkent), prepared for business trips

Lead HVAC Engineer, Senior HVAC Engineer, HVAC Engineer

Specializations:
  • Other

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, rotation based work

Work experience 20 years 1 month

June 2022January 2023
8 months
3GI SC HVAC Coordinator
System Completion
October 2021May 2022
8 months

Almaty

Construction, Real Estate, Architecture... Show more

HVAC Engineer
HVAC Engineer DDesign. - Perform all necessary calculations; - Verification of data from equipment vendors; The following deliverables were prepared: - Calculations (CAL); - HVAC Flow Diagrams (HFD); - Sketches for further drawings (LAY, GAD); - Material Take-Off (MTO);
November 2020September 2021
11 months

Construction, Real Estate, Architecture... Show more

Lead HVAC Engineer
Lead HVAC Engineer Pre-FEED; FEED; DDesign. - Arranging the workflow of the department; - Coordination of work with related departments; - Coordination of technical solutions with the client; - Participation in all necessary meetings; - Elaboration of technical solutions; - Checking the work performed in the department; - Development of HVAC systems in full, taking into account the requirements of local regulatory documents and client’s specifications; - Submission and justification of technical solutions to management for coordination and further application; - Elaboration of optimal technical solutions; - Perform all necessary calculations; - Verification of data from equipment vendors; The following deliverables were prepared: - Calculations (CAL); - HVAC Flow Diagrams (HFD); - Sketches for further drawings (LAY, GAD); - Material Take-Off (MTO);
August 2019November 2020
1 year 4 months
ENTER Engineering Pte. Ltd.

Tashkent

Construction, Real Estate, Architecture... Show more

Lead HVAC coordinator
Shurtan Gas Chemical Complex Upgrade Project at Republic of Uzbekistan
January 2019May 2019
5 months
Worley. KGNT

Uralsk

Lead HVAC Engineer
KARACHAGANAK EXPANSION PROJECT 1 1. KEP1A and KEP1B Compressor Buildings 2. Utility Building
May 2015January 2019
3 years 9 months
KPJV - Kazakh Project Joint Venture Limited (Fluor, WorleyParsons, KGNT, KING)

Almaty

Lead HVAC Engineer
Lead HVAC Engineer (TCO Future Growth Project - Wellhead Pressure Management Project). Pre-FEED; FEED; DDesign. Working on projects: 1. Spare Parts Warehouse. Warehouse area - 75,000 m3 Presence of administrative and auxiliary premises. Oil and gas field - Tengiz. Client - TCO. 2. Chemicals Warehouse Warehouse area - 36,000 m3 Presence of administrative and auxiliary premises. Oil and gas field - Tengiz. Client - TCO. 3. Chemicals Warehouse 2 Warehouse area - 36,000 m3 Presence of auxiliary premises. Oil and gas field - Tengiz. Client - TCO. 4. Power Generation Maintenance Building Production area - 1,000 m2 Presence of administrative and auxiliary premises. Office space serves as a shelter in place in case of an emergency release of H2S into the atmosphere. Oil and gas field - Tengiz. Client - TCO. 5. 3 Local Operator Rooms These LORs serve as a shelter in place in case of an emergency release of H2S into the atmosphere. Oil and gas field - Tengiz. Client - TCO. 6. Old Boiler HVAC Systems Upgrading The total capacity of the boiler house is 110 MW. Production of hot water and steam for heating systems and for process needs. Oil and gas field - Tengiz. Client - TCO. 7. Boiler House Heating and Mechanical and HVAC design. Fuel used - natural gas. The total capacity of the boiler house is 5,0 MW. Production of hot water for warehouse heat supply systems. Oil and gas field - Tengiz. Client - TCO. 8. Design of heating networks from the boiler house to consumers. 9. Laying the gas line from the tie-in point to the boiler house. 10. Main Chemical Laboratory. Modernization of HVAC systems to bring to indicators that meet the technical specifications of KPO and RoK standards. Oil and gas field - Karachaganak. Client - Karachaganak Petroleum Operating B.V. Functions: - Arranging the workflow of the department; - Scheduling project work (in conjunction with the planning department); - Budgeting for design work (determining the scope of work and determining the number of man-hours); - Coordination of work with related departments; - Coordination of technical solutions with the client; - Participation in all necessary meetings; - Elaboration of technical solutions; - Checking the work performed in the department; - Development of HVAC systems in full, taking into account the requirements of local regulatory documents and client’s specifications; - Submission and justification of technical solutions to management for coordination and further application; - Elaboration of optimal technical solutions; - Conducting a correct interpretation of the applicable RoK standards; - Perform all necessary calculations; - Verification of data from equipment vendors; The following deliverables were prepared: - Calculations (CAL); - Data sheets (DSH); - Process Flow Diagrams (HFD); - Equipment list (EQL); - Sketches for further drawings (LAY, GAD); - Material Take-Off (MTO); - HVAC Systems Operation Philosophy (PHL); - Scope of Work (SOW); - Cost estimates for design works (CTR).
August 2013May 2015
1 year 10 months
KPJV - Kazakh Project Joint Venture Limited (Fluor, WorleyParsons, KGNT, KING)

Atyrau

Construction, Real Estate, Architecture... Show more

Senior HVAC Engineer (TCO Future Growth Project - Wellhead Pressure Management Project)
Senior HVAC Engineer (TCO Future Growth Project - Wellhead Pressure Management Project) Working on projects: 1. Tengiz Motor Vehicles Maintenance Workshop (TFM). Client - TCO. 2. Food Production Facility (HBK) Oil and gas field - Tengiz. Client - TCO. The production volume is 12,000 servings per day. This facility carried out the entire cooking cycle and included all the necessary production facilities (cold, hot, cutting, equipment, washing, etc.), storage rooms and refrigerators, household premises. 3. General Goods Warehouse (FMA) Oil and gas field - Tengiz. Client - TCO. Food storage, storage of goods for various purposes with the maintenance of the necessary parameters of the microclimate in the warehouse. 4. Examination of the existing motor vehicles workshop for all purposes in order to determine the reasons for the improper functioning of the HVAC systems. Oil and gas field - Tengiz. Client - TCO. Site visit. A survey of the existing HVAC system was performed. The reasons for the failure of the HVAC system were identified. A report was prepared, which presented detailed information on the work done, indicated system malfunctions, as well as solutions to eliminate deficiencies and malfunctions. The report was provided to the client Functions: - Development of HVAC systems in full, taking into account the requirements of local regulatory documents and customer specifications; - Elaboration of optimal technical solutions; - Submission and justification of technical solutions to management for coordination and further use; - Conducting a correct interpretation of the applicable RoK standards; - Perform all necessary calculations in HEVACOMP software. If necessary, calculations were performed manually with a description of the entire calculation process; - Developing sketches of drawings for further drawings by a group of designers. The following deliverables were prepared: - Calculations (CAL); - Data sheets (DSH); - Process Flow Diagrams (HFD); - Sketches for further drawings (LAY, GAD);
October 2011July 2013
1 year 10 months
AECOM KZ

Almaty

Construction, Real Estate, Architecture... Show more

HVAC Engineer
Development of HVAC design for the biological safety level 3 laboratories (BSL - 3, 2. CRL). Supervised installation control for the indicated facilities. Performance of all required calculations for design of heating, ventilation and air conditioning systems. Collaboration with installation contractors. Approval of alterations to the design documentation. Approval of applied equipment and materials. Approval of alterations to the materials and equipment. Quality control of performed works and conformance to the normative requirements.
November 2010August 2011
10 months
A&S PLUS

Almaty

Construction, Real Estate, Architecture... Show more

Spread Foreman
Installation of heating, water piping, sewer and ventilation system. Cooperation with MEP contractors. Signing of various acts. Approval of the operational issues with the client. Projects: - Apartment Residential Estate (20 Kvartal); - Almaty regional Children Hospital with Outpatient Clinic.
June 2009November 2010
1 year 6 months
LLP «Intex –Holding Kazakhstan»

Almaty

Construction, Real Estate, Architecture... Show more

Technical Manager
Tradename Meibes. Presentation of the equipment, technical workshops, training of trade organizations personnel. Assistance in design development with application of proposed equipment. Training of installation personnel for assembling of Heat-Cold Supply Control System Units and selection of equipment. Provision of technical workshops with design engineers. Training on principles and order for design calculation of the proposed equipment.
September 2007June 2009
1 year 10 months
LLP "Ekos"

Almaty

Construction, Real Estate, Architecture... Show more

HVAC Engineer
Adoption of technical solutions on the designed facilities. Design of heating, ventilation, floor heating, cold supply systems, heat and cold supply control system units (mechanical part) including apartments and multifunctional estates. Selection of automation and hydraulic control equipment for heat and cold supply systems. Coordination of design and technical solutions with the client and MEP. Site supervision control of project solutions performance. Projects: -Buildings of national company "KTZH" in Astana; -Buildings of Residential Complex "Shakhristan" in Almaty; -Agricultural wholesale market in Astana; -Passenger terminal of Almaty Airport.
May 2004September 2007
3 years 5 months
LLP «Fantasy»

Almaty

Construction, Real Estate, Architecture... Show more

HVAC Engineer
Adoption of technical solutions on the designed facilities. Design of heating, ventilation, floor heating, cold supply systems, heat and cold supply control system units (mechanical part) including apartments and multifunctional estates. Selection of automation and hydraulic control equipment for heat and cold supply systems. Coordination of design and technical solutions with the client and MEP. Site supervision control of project solutions performance
October 2002May 2004
1 year 8 months
LLP "Akitra"

Almaty

Construction, Real Estate, Architecture... Show more

HVAC Engineer
Adoption of technical solutions on the designed facilities. Design of heating, ventilation, floor heating, cold supply systems, heat and cold supply control system units (mechanical part) including apartments and multifunctional estates. Selection of automation and hydraulic control equipment for heat and cold supply systems. Coordination of design and technical solutions with the client and MEP. Site supervision control of project solutions performance

Skills

Skill proficiency levels
Heating Ventilation Conditioning Engineer Mechanical

About me

Key performance indicators Started as internal plumber, then as welder and section foreman. In parallel with job graduated in KazGASA as «Heat and Gas Supply, Ventilation and air-pollution control». Experienced in installation of plumbing systems for civil buildings, examination of already commissioned facilities, and resolution of issues associated with operability of heating units and heat and cold supply systems. Design of multifunctional, residential estates, public and administrative buildings. Experienced in application of solar systems and heat pumps in projects. Design development of floor heating systems. Experienced in performance of all required heating, ventilation and air conditioning systems, adoption of technical solutions, development of heating and air conditioning systems for luxury buildings.

Higher education

2002
KazGASA
Heat and Gas Supply, Ventilation and air-pollution control, civil engineer

Languages

RussianNative


EnglishB1 — Intermediate


Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter