Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online today at 02:18
Candidate
Male, 45 years, born on 24 May 1979
Actively searching for a job
Tashkent, willing to relocate, prepared for business trips
Инженер АСУТП
Specializations:
- Design engineer
Employment: full time
Work schedule: shift schedule, rotation based work
Work experience 20 years 10 months
February 2021 — currently
4 years 3 months
WoodKSS (Kazakhstan)
SIS/FGS Engineer
Work under the international project - Future Growth Project, Kazakhstan.
Tengizchevroil. SAT, start-up, function test
March 2020 — September 2020
7 months
Fircroft Engineering Services Limited Kazakhstan LLP (Kazakhstan)
C&P MAC Automation Engineer
C&P MAC Automation Engineer, Fircroft Engineering Services
Limited Kazakhstan LLP
Work under the international project - Future Growth Project,
Tengizchevroil,
On site services: Review documents and procedures, troubleshooting, Application FAT for FGS and SIS (Honeywell SM)
February 2017 — September 2019
2 years 8 months
Swift Oil and Gas Technical (China)
PLDS Integration Engineer
Work under the international project- Chuandongbei Gas
Project, Chevron-CNPC
On site services: SAT and commissioning Rebellion leak detection cameras (Photonics) and H2S point detectors
(RAE), maintenance support, troubleshooting, leak test, integrate with Honeywell Experion PKS R410 system, Programming Сompactlogix PLC, Commissioning CAS
(Community Alarm Systems),
February 2015 — December 2016
1 year 11 months
Sepam (China)
China
ICPS/SCADA, PLDS Engineer
Work under the international project- Chuandongbei Gas
Project, Chevron-CNPC
On site services: SAT and commissioning Pipeline Leak
Detection Systems (Atmos, DAS, DTS), Commercial metering system and integration with Honeywell Experion PKS R410 system through OPC, SCADA for H2S point detectors
(Experion PKS R430.1), preparation commissioning
procedures, request change preparation and implementation, Functional test, bitmap test, start-up support, end-user training
November 2012 — October 2014
2 years
Linde Engineering (UAE)
DCS/ESD engineer
DCS/ESD engineer, Linde Engineering (UAE)
Work under the international project as - Ethylene Plant EU3 ``Linde Engineering'' - control system (DCS system based on the Experion PKS R400.2 , ESD system based on SM R151.2 and Compressor control based on Triconex system) for the Ethylene project unit of Borouge(UAE). On site services: SIT, SAT, loop checking,commissioning, start-up, designing system schematics, project engineering, designing logic algorithms, programming controllers C300, as-build documentation, implementation MOC, upgrade system
October 2005 — November 2012
7 years 2 months
Open Joint Stock company “Himavtomatika” Technical Center Honeywell in Uzbekistan
DCS/Service Engineer
Mar 2010 – Nov 2012 Lead Engineer.
Jul 2008 – Mar 2010 DCS/Service Senior Engineer
Jan 2008 – Jul 2008 DCS/Service Engineer 1 category
Oct 2005 –Dec 2007 DCS/Service Engineer
Projects:
1) Sep 2010 –Nov 2012
Work under the international project – control system DCS,
based on the Experion PKS R310.3 system and ESD, F&G
system based on SM R133.1) for the Shell Pearl GTL
(Gas To Liquid) Project (Qatar). On site services: Loop
checking, commissioning, sequence logic, start-up,
troubleshooting, programming controllers C300 and SM,
implementation MOC. DB, Graphics, Control Strategies,
Logic, Serial Links, Documentation.
Position as DCS/IPS Engineer:
- Commissioning Team (C4 area-Chiyoda(EPC))
- PCRI Team,
- Star-Up team
2) Jul 2010 – Aug 2010 Work under the international project - ESD system, based on FSC R702 for the ESPO (Eastern Siberia – Pacific Ocean) oil pipeline project (Russia).
On site services: programming controllers FSC, cause
effect, function test, implementation MOC
3) Aug 2009 – Jun 2010 Work under the international project – Ethylene Plant EU2 “Linde” - control system (DCS system based on the Experion PKS R310.2 and ESD system based on SM R131.5) for the Ethylene project unit of Borouge (UAE). On site services. SAT, loop checking, commissioning, start-up, designing system schematics, project engineering, designing logic algorithms, on-site system mounting, programming controllers C300, as-build documentation, implementation MOC
4) Jul 2009 –Aug 2009 Work under the international project – PJSC “Stroytransgaz” - ESD system based on FSC R702 for the South Middle AreaGas Plant (Syria). On site services. SAT, loop checking,cause effect, commissioning, start- up.
5) Aug 2008 – Jul 2009 Work under the project - control system (DCS system based on the Experion PKS R310.2 and ESD system based on SM R131.2) for the Ammonia production (AM-76 unit) project unit of Ferganaazot plant (Uzbekistan). On site services. SAT, loop checking, commissioning, start- up, designing system schematics, project engineering, designing logic algorithms, on-site system mounting, programming controllers C300, Safety Manager.
6) Jul 2008 – Aug 2008 Work under the project - control system (DCS system based on the TPS and ESD system based on FSC R701) for the Gasoline Specification Improvement project unit of Tupras Izmir refinery plant (Turkey). On site services. SAT, loop checking, commissioning, cause effect, function test, start-up, programming controllers HPM, FSC.
7) May 2008 – Jun 2008 Work under the international project – Tengizchevroil Asset
Development Projects, Tengiz, (Republic of Kazakhstan).
Second Generation Plant. Sulphur, Oil & Gas (TPS) Under
the order of Honeywell Kazakhstan Republic. On site
services. SAT, Loop checking, commissioning, start-up,
programming controllers HPM
8) May 2007 – Dec 2007 Work under the international project – Tengizchevroil Asset
Development Projects, Tengiz, (Republic of Kazakhstan).
Second Generation Plant. LPG Storage Area (Experion PKS
R201 SCADA, ControlLogix5555, TPS). Under the order of
Honeywell Kazakhstan Republic. On site services. SAT,
Loop checking, commissioning, programming controllers
ControlLogix5555, start-up.
9) Feb 2007 – May 2007 Experion PKS R101. Service work at Kungrad Soda Plant
(Uzbekistan).
10) Dec 2006 – Feb 2007 Work under the project – control system (DCS based on the Experion PKS R210 system) for the “UMID” gas-field, Gas Treatment Combined Unit. Mubarak, Uzbekistan. Project engineering, designing logic algorithms, designing system schematics, programming controllers C200, on site system mounting, start-up and end-user training.
11) Oct 2006 – Nov 2006 Work under the international project - control system (DCS and ESD based on the Experion PKS R210 system) for the Benzol unit of Mozyr refinery plant (Republic of Belarus). On site services: Control strategies, loop checking,commissioning.
12) Jan 2006 – Apr 2006
Work under the international project - control system (DCS
and ESD based on the Experion PKS R210 system) for the
Extractive Distillation unit of Mozyr refinery plant (Republic of
Belarus). Office engineering, programming controllers C200.
13) Oct 2005 – Nov 2005
Work under the international project - control system (DCS and ESD, based on the Experion PKS R210 system) for the
Alkylation unit of Mozyr refinery plant (Republic of Belarus).
Office engineering, programming controllers C200.
14) Nov 2005 - Jan 2009 PlantScape System R 500.1. Service work at Water Pump Station in Nukus (Uzbekistan)
September 2002 — December 2004
2 years 4 months
Tashkent Chemical Technology Institute
Teacher of Information Technology
Teached students to Information Technology
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
I have experience of 15 years working on Process Control &Safety Shutdown systems in refineries, petrochemical and chemical plants operations which includes detailed
Engineering & Programming, commissioning, start-up and
maintenance support at various Chevron, Shell and Linde
locations i.e. China (CDB), Kazakhstan (Tengiz), Qatar (Pearl GTL), Linde (Borouge2&3). Familiar with international HSE standards, engineering codes and practices and hazardous areas experience.
AWARD:
May 2018 - Human energy award for outstanding performance (Chuandongbei Gas, Project Chevron, China)
ACTIVITIES:
Project Engineering, design, configuration, installation and
commissioning control applications, programming controllers C200, C300, RTU2020, ControlLogix5555, Triconex, HPM, FSC and Safety Manager, Experion PKS, graphics building,control strategy developing, loop checking, commissioning and start-up. Training and presenting to system users, commissioning pipeline leak detection systems (Atmos,SensorNet, Optasense), Rebellion camera, FloBoss 600 flow computer.
SKILLS:
Troubleshooting, maintenance support, start-up support, Control Systems, Start-up, Project Engineering, design, Installation and Commissioning, configuration, HPM Implementation, Process Control, site support, system maintenance, SCADA, request change preparation and implementation, Visual Basic, Algorithms, AM, user training, Allen-Bradley, controllers programming
Higher education (master)
2002
the Tashkent State Technical University
Masters Degree
2000
the Tashkent State Technical University
Bachelors Degree
Languages
Citizenship, travel time to work
Citizenship: Uzbekistan
Permission to work: Uzbekistan
Desired travel time to work: Doesn't matter