Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online a week ago
Candidate
Male, 29 years, born on 29 June 1995
Actively searching for a job
Atyrau, willing to relocate (Other regions, Kazakhstan, Moscow, Tashkent), prepared for business trips
Electrical & Instrumentation Engineer
Specializations:
- Other
- Design engineer
- Electronics engineer
- Production line operator
Employment: full time, project work
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 7 years 11 months
December 2021 — currently
3 years 6 months
"PETROFAC-ISKER" COMPANY
Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more
Electrical & Instrumentation/Telecom Engineer
1) Coordinate and supervise below E&I/T construction activities at the site and track for
execution as per the NWTF (New Water Treatment Facilities) Project requirements.
- Electrical part: Installation of the Earthing System for the Buildings (also installation of
Lightning protection) and for overall earthing, Lighting System for Safe and Hazardous areas,
Installation of the HV/LV Switchboards (10kV/400V), Installation of Electrical Heat Tracing
System for the Pipeline and Equipment, also working with Cathodic Protection System
(Internal Sacrificial Anode System and Internal Impressed Current CP System), also Glanding
and Termination works of HV/LV cables.
- Instrumentation part: Installation of detectors and JBs for the Fire & Gas Systems, Working
with ESD (Emergency Shut Down) and DCS (Distributed Control System), Installation of
Instruments and Panels (Pressure, Temperature, Flow, Flow Orifice, Level Transmitters and
Gauges, Analyzer cabinet from the Manufacturer: ABB, Endress+Hauser, Emerson,
Rosemount, changing of parameters with using Hard communicator (Yokogawa, Emerson)
- Telecom part: Installation of the PAGA system, CCTV, ACS, and Telephone system for the
field area and for buildings.
2) Plan and split the EIT scope of work as per the CWP&IWP system
(Construction/Installation Work Package) as below:
- Certificate of Successful Completion of the Training of AWP Fundamentals from Trillium
Advisory Group (by Gary Orton – Vice President – of Strategic Services)
- Preparation of Work Packages (IWP) for each scope of work.
- Control of correctness of registration of the document.
- Revealing constraints during the planning of works.
-Tracking for the elimination of the constraints.
-Bring the work package to completion status.
3) Selection and Purchase of the Project Materials as per the PRF Form (Purchase
Requisition Form). Review process automation system equipment bidders' technical bid and
prepare TBE. Full checking and confirming of purchased materials with Project requirements
and tracking of materials from purchase to the delivery stage to site.
4) Preparation of the Method Statement for the EIT activity from the review stage till the stage
of approval for Construction.
5) Implementation of the Project drawings in case of design changes according to the FCN
(Field change notice) and RLMU (Red Line Mark-Up) system.
6) Ensure distribution of EIT scope of work among the subcontractors to performing special
activities (such as Transformer oil Filling-up, Splice kitting of HV cables, and External
Cathodic Protection System) as per the preparation of SRF (Service Requisition Form).
Verification of the Project drawings, and calculation of manpower and equipment for required
activities.
7) Have work experience in consist of Mechanical completion department as indicated below:
- Coordination and tracking closure of ITRs and Punches for further successfully completing of
Subsystems.
- Uploading / Closing checklists and Punch List Items into the SPITCH System. Good knowledge
of working SPITCH Software.
- Arranging and Participation of the MCWD (Mechanical Completion Walkdown) for the checking
and ensuring that all activities are completed at the site as per the ITRs for the further closing
subsystem. Performed all duties required to coordinate mechanical completion walk downs and
coordinated and planned for mechanical completion walk down.
- Colloborate with Construction and QA/QC departments for deciding any issues for closing ITRs and
Punch Items.
- Prepare Loop Folders, Work Packages, and Completion Dossiers (electronic unless required
hardcopy by regulatory) to support the approval/acceptance of Systems or SubSystem Groups
according to the Turnover / Handover Philosophy
- Preparation of DCRF (Data Change Request Form) for the deletion of Tags and ITRs from the
Spitch System according to RLM drawings.
- Confirmed Punch list items and ITR and MC/PC Certificate status were continuously updated
and sent as Daily Reports.
- Preparation of system handover certification dossier and associated documentation with
attention to detail.
- Performed all duties required to get all certificates signed by the Client.
April 2021 — December 2021
9 months
“Quantor, Engineering and Consulting Group”; “ZamanQuantor”
Atyrau, quantor-ufa.ru
Industrial Equipment, Machine Tools and Components... Show more
PTD E&I Engineer
1. Participation in the work of the project and implementation of design, executive and
production documentation, execution of documentation of suppliers for the projects "BKK SOU
UPSS 204km, modernization" and "Fire and gas detection system"
2. Maintenance and control of the project “Equipment at the PS of containers for storage of
chemically hazardous substances” at PS “Atyrau”, PS “Kurmangazy”, PS “Isatai”, PS “Tengiz”
from the beginning of construction and installation works to the commissioning stage.
3. Keeping an EIT log of work performance, a log of verification of purchased products, and
special logs, such as a cable log, method statements, etc.
4. Control over the execution of construction and installation works for timely reporting and, for
further issuing Acts for closure.
5. Verification of the compliance of the scope of construction and installation works with the
approved estimate design documentation, building codes and regulations, working drawings,
and technical specifications.
6. Participation in the coordination of changes in design decisions that arise during
construction, and prompt resolution of issues related to the construction, materials, fabrication.
7. Execution of Acts of work performed for the examination of hidden works, for intermediate
acceptance of critical structures, Acts of incoming control and an Act on the completion of
installation work, a list of installed devices, etc.
8. Ensure verification of the estimate documentation of work, accounting, and calculation of
the cost of work performed.
9. Tracking and providing technical documentation, equipment, and materials for execution of
work.
10. Implementation of changes for Project drawings and agreement with Author Supervision
Team for further closure Acts.
January 2018 — March 2021
3 years 3 months
LLP "GATE-SATYAPI"
Atyrau
Project Coordinator
1. Analyze and approve work principles and approaches developed by the Project Manager,
follow-up with audits.
2. Participate in the work of the project in the Tengiz (FGP - Future Growth Project) , controlling its working aspects.
3. Resolving, within the scope of competence, emerging production issues
4. Interaction with governmental and regulatory authorities, external specialists, business
correspondence with them
5. Preparation of reports on the progress and interim results of work for management and
proposals to improve their efficiency.
6. Implementation and under control of all project documentation (Daily Report, Progress
Report, Flash Report, Weekly, etc.)
7. Planning and distribution of the project's scope of work for the construction with the
responsible employers.
June 2017 — August 2017
3 months
LLP “BashNeft – Ufa”
Ufa, www.bashneft.ru
Oil and Gas... Show more
Process unit Operator (Curricular Practical Training)
1) Follow the technological regime
2) Know the rules, alarms and blocking devices and lines
3) Comply with the requirements of labor protection and safety
4) Monitor the condition of equipment and pipelines, be able to take samples.
5) Successfully completed additional course of Oil and Gas Operator 4 group.
June 2016 — August 2016
3 months
LLP “BashNeft – Ufa”
Ufa, www.bashneft.ru
Oil and Gas... Show more
Instrumentation technician (Curricular Practical Training)
1) Checking electrical measuring instruments of all types and systems
2) Verification of radio measuring instruments of all types and systems designed to measure
physical quantities
3) Identification and elimination of problems in the operation of equipment
4) Mathematical processing of measurement results and registration of the necessary materials
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
Detail-oriented engineer with background experience in the oil and gas industry and a zest for
solving complex objectives. Seeks to expand as an Engineer by using proven managements,
construction and E&I skills, also always ready to learn and study new knowledge for my
growth being a demand expert.
Higher education
2017
Ufa State Petroleum Technological University
Technological, Biotechnology in the Oil & Gas Industry
Languages
Professional development, courses
2022
AWP Fundamentals
Trillium Advisory Group a Zachry Group Company, Project Planning
2018
RWP and Hazard Assessment
Tengizchevroil, HSE
2017
LLC “Educational Fuel and Energy Plant”
LLC “Educational Fuel and Energy Plant”, Operator of technological installations of the 4th category
2017
ТОО «Caspian Training group»
ТОО «Caspian Training group», English Language Courses
Tests, examinations
2022
AWP FUNDAMENTALS CERTIFICATE
Trillium Academy, Project Planning by System (Advanced Work Package (AWP), Construction Work Package (CWP), Installation Work Package (IWP))
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter