Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online a week ago

Candidate

Male, 29 years, born on 29 June 1995

Actively searching for a job

Atyrau, willing to relocate (Other regions, Kazakhstan, Moscow, Tashkent), prepared for business trips

Electrical & Instrumentation Engineer

Specializations:
  • Other
  • Design engineer
  • Electronics engineer
  • Production line operator

Employment: full time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 7 years 11 months

December 2021currently
3 years 6 months
"PETROFAC-ISKER" COMPANY

isker-group.com/

Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more

Electrical & Instrumentation/Telecom Engineer
1) Coordinate and supervise below E&I/T construction activities at the site and track for execution as per the NWTF (New Water Treatment Facilities) Project requirements. - Electrical part: Installation of the Earthing System for the Buildings (also installation of Lightning protection) and for overall earthing, Lighting System for Safe and Hazardous areas, Installation of the HV/LV Switchboards (10kV/400V), Installation of Electrical Heat Tracing System for the Pipeline and Equipment, also working with Cathodic Protection System (Internal Sacrificial Anode System and Internal Impressed Current CP System), also Glanding and Termination works of HV/LV cables. - Instrumentation part: Installation of detectors and JBs for the Fire & Gas Systems, Working with ESD (Emergency Shut Down) and DCS (Distributed Control System), Installation of Instruments and Panels (Pressure, Temperature, Flow, Flow Orifice, Level Transmitters and Gauges, Analyzer cabinet from the Manufacturer: ABB, Endress+Hauser, Emerson, Rosemount, changing of parameters with using Hard communicator (Yokogawa, Emerson) - Telecom part: Installation of the PAGA system, CCTV, ACS, and Telephone system for the field area and for buildings. 2) Plan and split the EIT scope of work as per the CWP&IWP system (Construction/Installation Work Package) as below: - Certificate of Successful Completion of the Training of AWP Fundamentals from Trillium Advisory Group (by Gary Orton – Vice President – of Strategic Services) - Preparation of Work Packages (IWP) for each scope of work. - Control of correctness of registration of the document. - Revealing constraints during the planning of works. -Tracking for the elimination of the constraints. -Bring the work package to completion status. 3) Selection and Purchase of the Project Materials as per the PRF Form (Purchase Requisition Form). Review process automation system equipment bidders' technical bid and prepare TBE. Full checking and confirming of purchased materials with Project requirements and tracking of materials from purchase to the delivery stage to site. 4) Preparation of the Method Statement for the EIT activity from the review stage till the stage of approval for Construction. 5) Implementation of the Project drawings in case of design changes according to the FCN (Field change notice) and RLMU (Red Line Mark-Up) system. 6) Ensure distribution of EIT scope of work among the subcontractors to performing special activities (such as Transformer oil Filling-up, Splice kitting of HV cables, and External Cathodic Protection System) as per the preparation of SRF (Service Requisition Form). Verification of the Project drawings, and calculation of manpower and equipment for required activities. 7) Have work experience in consist of Mechanical completion department as indicated below: - Coordination and tracking closure of ITRs and Punches for further successfully completing of Subsystems. - Uploading / Closing checklists and Punch List Items into the SPITCH System. Good knowledge of working SPITCH Software. - Arranging and Participation of the MCWD (Mechanical Completion Walkdown) for the checking and ensuring that all activities are completed at the site as per the ITRs for the further closing subsystem. Performed all duties required to coordinate mechanical completion walk downs and coordinated and planned for mechanical completion walk down. - Colloborate with Construction and QA/QC departments for deciding any issues for closing ITRs and Punch Items. - Prepare Loop Folders, Work Packages, and Completion Dossiers (electronic unless required hardcopy by regulatory) to support the approval/acceptance of Systems or SubSystem Groups according to the Turnover / Handover Philosophy - Preparation of DCRF (Data Change Request Form) for the deletion of Tags and ITRs from the Spitch System according to RLM drawings. - Confirmed Punch list items and ITR and MC/PC Certificate status were continuously updated and sent as Daily Reports. - Preparation of system handover certification dossier and associated documentation with attention to detail. - Performed all duties required to get all certificates signed by the Client.
April 2021December 2021
9 months
“Quantor, Engineering and Consulting Group”; “ZamanQuantor”

Atyrau, quantor-ufa.ru

Industrial Equipment, Machine Tools and Components... Show more

PTD E&I Engineer
1. Participation in the work of the project and implementation of design, executive and production documentation, execution of documentation of suppliers for the projects "BKK SOU UPSS 204km, modernization" and "Fire and gas detection system" 2. Maintenance and control of the project “Equipment at the PS of containers for storage of chemically hazardous substances” at PS “Atyrau”, PS “Kurmangazy”, PS “Isatai”, PS “Tengiz” from the beginning of construction and installation works to the commissioning stage. 3. Keeping an EIT log of work performance, a log of verification of purchased products, and special logs, such as a cable log, method statements, etc. 4. Control over the execution of construction and installation works for timely reporting and, for further issuing Acts for closure. 5. Verification of the compliance of the scope of construction and installation works with the approved estimate design documentation, building codes and regulations, working drawings, and technical specifications. 6. Participation in the coordination of changes in design decisions that arise during construction, and prompt resolution of issues related to the construction, materials, fabrication. 7. Execution of Acts of work performed for the examination of hidden works, for intermediate acceptance of critical structures, Acts of incoming control and an Act on the completion of installation work, a list of installed devices, etc. 8. Ensure verification of the estimate documentation of work, accounting, and calculation of the cost of work performed. 9. Tracking and providing technical documentation, equipment, and materials for execution of work. 10. Implementation of changes for Project drawings and agreement with Author Supervision Team for further closure Acts.
January 2018March 2021
3 years 3 months
LLP "GATE-SATYAPI"

Atyrau

Project Coordinator
1. Analyze and approve work principles and approaches developed by the Project Manager, follow-up with audits. 2. Participate in the work of the project in the Tengiz (FGP - Future Growth Project) , controlling its working aspects. 3. Resolving, within the scope of competence, emerging production issues 4. Interaction with governmental and regulatory authorities, external specialists, business correspondence with them 5. Preparation of reports on the progress and interim results of work for management and proposals to improve their efficiency. 6. Implementation and under control of all project documentation (Daily Report, Progress Report, Flash Report, Weekly, etc.) 7. Planning and distribution of the project's scope of work for the construction with the responsible employers.
June 2017August 2017
3 months
LLP “BashNeft – Ufa”

Ufa, www.bashneft.ru

Oil and Gas... Show more

Process unit Operator (Curricular Practical Training)
1) Follow the technological regime 2) Know the rules, alarms and blocking devices and lines 3) Comply with the requirements of labor protection and safety 4) Monitor the condition of equipment and pipelines, be able to take samples. 5) Successfully completed additional course of Oil and Gas Operator 4 group.
June 2016August 2016
3 months
LLP “BashNeft – Ufa”

Ufa, www.bashneft.ru

Oil and Gas... Show more

Instrumentation technician (Curricular Practical Training)
1) Checking electrical measuring instruments of all types and systems 2) Verification of radio measuring instruments of all types and systems designed to measure physical quantities 3) Identification and elimination of problems in the operation of equipment 4) Mathematical processing of measurement results and registration of the necessary materials

Skills

Skill proficiency levels
Operating System Windows/MAC;
Microsoft Office software package;
MS Project Planning;
EDMS;
IPMS;
SPITCH Completion software;
AUTOCAD software;
Power BI;
AWP (Advanced Work Package) Software;
Primavera P6

Driving experience

Driver's license category B

About me

Detail-oriented engineer with background experience in the oil and gas industry and a zest for solving complex objectives. Seeks to expand as an Engineer by using proven managements, construction and E&I skills, also always ready to learn and study new knowledge for my growth being a demand expert.

Higher education

2017
Ufa State Petroleum Technological University
Technological, Biotechnology in the Oil & Gas Industry

Languages

KazakhNative


EnglishC1 — Advanced


RussianC2 — Proficiency


TurkishB1 — Intermediate


Professional development, courses

2022
AWP Fundamentals
Trillium Advisory Group a Zachry Group Company, Project Planning
2018
RWP and Hazard Assessment
Tengizchevroil, HSE
2017
LLC “Educational Fuel and Energy Plant”
LLC “Educational Fuel and Energy Plant”, Operator of technological installations of the 4th category
2017
ТОО «Caspian Training group»
ТОО «Caspian Training group», English Language Courses

Tests, examinations

2022
AWP FUNDAMENTALS CERTIFICATE
Trillium Academy, Project Planning by System (Advanced Work Package (AWP), Construction Work Package (CWP), Installation Work Package (IWP))

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter