Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 48 years, born on 5 December 1976

Not looking for a job

Tashkent, willing to relocate, not prepared for business trips

Project director, Manager

6 000 $ in hand

Specializations:
  • Project manager

Employment: full time

Work schedule: full day

Work experience 25 years 1 month

April 2017currently
8 years 2 months
GTL
Deputy Project Director
Review & manage EPC Contractor engineering works Review and Approve EPC Engineering Deliverables Provide Engineering and Construction Support to Operation Group Review & manage EPC Engineering Drawings and Specification Obtain all necessary permits and licenses. Oversee the day to day operations of all project related construction works Review & manage proposed project design documents for constructability Attend strategy meetings with other construction organizations Check techniques for compliance with applicable standards and specifications Generate and review change orders for accuracy, scope of work and pricing Observe work during progress and upon completion for conformance
January 2012April 2017
5 years 4 months
GTL
Project Manager
Provided Technical Support and monitoring local engineering companies Reviewed & managed In-Country Permitting Plan Reviewed & managed EPC Permitting Plan Reviewed & managed FEED Contractor engineering works Assisted PMT on issues related to EPC o Reviewed and Approved EPC Engineering Deliverables o Reviewed & managed EPC Engineering Drawings and Specification Reviewed & managed the documents for development of prefeasibility study Ensured compliance with schedule, budget and engineering design Checked and enforced employee, project and equipment safety Led, oversaw and participated in inspecting work quality and materials used
April 2004January 2012
7 years 10 months
Gas Chemical Complex
Deputy chief of the Polyethylene Plant
Managed Polyethylene Plant (Reaction, Recycle, Finishing, Butene-1 and Packing) Directed and supervised workers. Managed document control and quality control Prepared production plan Prepared monthly/yearly chemicals consumption lists o Managed material order, delivery and installation processes
September 2002April 2004
1 year 8 months
Shurtan Gas Chemical Complex
Deputy chief of the reaction & distillation unit of the polyethylene plant
Conducted startup activities of plant Conducted production/safety trainings with operators, shift engineers Worked on improvement of technological process using innovation systems Monitored cleaning process of drainage systems, heat exchangers tube sheets, pipelines Conducted maintenance works of pumps and compressors Prepared activities for summer and winter seasons Conducted fire and gas hazardous work
May 2000September 2002
2 years 5 months
Gas Chemical Complex
Shift supervisor of polyethylene plant
Monitored EPC construction works on site Reviewed punch lists Participated on hydraulic and pneumatic tests Checked equipment, vessels, tubes and etc. for operability Participated in plant modification and troubleshooting processes Prepared technical reports and task analysis Conducted trainings for operators Managed the overall polyethylene&butene-1 production process

Driving experience

Driver's license category B

About me

Completion of tasks, sociability

Higher education

1998
Ташкентский химико технологический институт
Неорганическая химия, Инженер-технолог

Languages

UzbekNative


Citizenship, travel time to work

Citizenship: Uzbekistan

Permission to work: Uzbekistan

Desired travel time to work: Doesn't matter