Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 48 years, born on 21 September 1976

Tashkent, not willing to relocate, prepared for business trips

Project Manager

5 000 $ in hand

Specializations:
  • Project manager

Employment: full time

Work schedule: full day

Work experience 25 years 5 months

February 2017currently
8 years 3 months
Oil Design and Construction Company
Project Manager / Lead process engineer
Basic design of LPG treating Unit, Abadan refinery upgrading project, Iran Basic design of Catalyst Reformer unit revamp project, Tehran refinery, Iran
January 2014January 2017
3 years 1 month
HALDOR TOPSOE , Denmark
Senior Process Engineer, Refinery Department
Abadan refinery Hydro cracker Project (EPC phase) , Iran Isfahan refinery HDS and HDA Project (EPC phase), Iran Basic design of Naphtha hydro treater unit, SIRAF gas condensate refinery project, Iran Basic design of Diesel hydro treater unit, Revamp project, Pavlodar refinery, Kazakhstan KNPC clean fuel refinery Project, NHT, CNHT and KHT, EPC phase, Kuwait Feasibility study and basic design for diesel hydro treater unit, Assiut refinery, Egypt Basic design of Naphtha hydro treater unit, Thailand oil public company Feasibility study for NHT & GOHT, Revamp of existing hydro treating units, Thailand Oil Public Company
February 2011December 2013
2 years 11 months
WORLEY PARSONS working at PDO - SHELL , Oman
Senior Process Engineer
Preparation of PFS, PEFS and PSFS, Process calculations as pump calculation, PSV calculation, control valve calculation, equipment sizing, Flare and blow down calculation, Flare network sizing and simulation with FLARENET, Depressurizing and blow down calculation, participate in desktop and design review meeting. Preparation of process documents as process description, equipment list, Line list, equipment process data sheet, safeguarding memorandum and control narrative. Participate in HAZOP, IPF, design and SIL review meetings. All projects according to Shell DEPs. Projects: FEED of Boudour Project FEED of RABAB HARWEEL Integrated Project. Inlet separation facilities, Sour Gas Dehydration Units, Sour Gas Injection Compression trains, Gas Sweetening Unit (GSU) trains, Molecular Sieve Unit (MSU), Hydrocarbon Dew pointing Unit, Condensate Dehydration, Condensate Stabilization Unit. (PDO) Rabab, Oman FEED of Al-Ghubar Project. Steam injection and Hydrocarbon Production (PDO) Al-Ghubar, Oman
September 2008February 2011
2 years 6 months
PARS OIL AND GAS COMPANY (General Contractor), Tehran
Senior Process Engineer
Process endorsement of Basic Design and Feed documents as follow: Process documents (operating manual, safeguarding and control narrative, philosophies, load list, line list ...), Process Drawings (PFS, PSFS, PEFS , DPDT and MSD) ,Calculations (Pump, RV, Vessel sizing, heat exchanger thermal rating, control valve ...), Flare network design and participate in HAZOP review meeting. Project: Detail design of Gas plant (EPC project) Inlet separation facilities, Sour Gas Dehydration Units, Sour Gas Injection Compression trains, Gas Sweetening Unit (GSU) trains, Molecular Sieve Unit (MSU), Hydrocarbon Dew pointing Unit, Condensate Dehydration, Condensate Stabilization Unit, LPG recovery and Sulfur recovery unit. Phases 6, 7 and 8 of South Pars Gas Reservoir, Iran
August 2007August 2008
1 year 1 month
FOSTER WHEELER , Malaysia
Process Engineer
Position : Process Engineer Process engineer for detail design of C5 ISOMERIZATION unit (Licensor: UOP), CCR (Catalytic Reforming) unit (Licensor: UOP) and NHT (Naphta Hydrotreater) unit (Licensor: UOP). Checking and preparation of PFS, PEFS, DPDT, PSFS, process description, equipment list, Line list, equipment process data sheet and detail design documents according to process deliverable list, Control valve calculation and preparation of data sheet, PSV calculation and preparation of data sheet, Hydraulic calculation and Line sizing for hydraulic guarantee circuits, Pump calculation and preparation of data sheet, preparation of safeguarding memorandum and control narrative , Preparation of design case matrix, Heat exchanger thermal rating and participate in HAZOP review meeting. Project: PSR2 revamp project (EPC project) Petronas PSR2 refinery revamp project include Crude distillation unit, Naphtha hydrotreater, C5 Isomerisation unit, CCR (Catalytic Reforming) unit, Isomax unit, LPG unit and utilities. Melaka, Malaysia
July 2005July 2007
2 years 1 month
Oil Design and Construction Company
Process Engineer
Process engineer for Detail design of LPG Merox unit (Licensor: UOP) and Propylene Recovery Unit (Licensor: UOP). Process engineer for basic design and feed of ISOMERIZATION unit (licensor: UOPL), LPG MEROX unit (licensor: UOPL), KHT and GOHT units (Licensor: Haldor Topsoe). Checking and preparation of PFS, PEFS, DPDT, PSFS, process description, equipment list, Line list, equipment process data sheet, Control valve calculation and preparation of data sheet, PSV calculation and preparation of data sheet, Hydraulic calculation and Line sizing for hydraulic guarantee circuits, Pump calculation and preparation of data sheet, Heat exchanger thermal rating and participate in HAZOP review meeting. Preliminary sizing of FLARE network. Projects: ARAK Refinery Expansion and Products upgrading project (EPC project) ARAK refinery revamp project include Propylene Recovery Unit, LPG merox and Utilities. Working on utilities package such as instrument air, fuel gas, steam. Arak, Iran Basic design of gas condensate refinery, Include Crude distillation unit, Naphtha hydrotreater, Kerosene hydrotreater, diesel hydrotreater, C5 Isomerisation, CCR (Catalytic Reforming) unit, LPG merox, LPG recovery, Sour water stripper unit, Sulfur recovery unit and Utilities. Bandar Abbas, Iran
August 2004June 2005
11 months
ENER CHIMI Co.
Process Engineer
Position : Process Engineer Process engineer for detail design of compressor station and gas sweetening plant, Review of PFD and P&ID of compressor station and gas sweetening plant, Control valve calculation, Hydraulic calculation, Line sizing and PSV calculation. Project: AMAK Gas Plant project (EPC project) Inlet separation facilities, Sour Gas Dehydration Units, Sour Gas gathering Compression trains, Gas Sweetening Unit (GSU) trains, sulfur recovery unit and utilities. Ahwaz, Iran
December 1999July 2004
4 years 8 months
PARGASIRAN Co.
Process Engineer
Feasibility study and concept engineering, Feasibility study and concept selection for gas sweetening and sour water stripper units ,Checking and preparation of PFS, PEFS, process description, equipment list, Line list, equipment process data sheet, Control valve calculation and preparation of data sheet, PSV calculation and preparation of data sheet, Hydraulic calculation and Line sizing for hydraulic guarantee circuits, Pump calculation and preparation of data sheet, Heat exchanger thermal rating. Working on utilities package such as Desalination and cooling towers design. LOCAL SEMINARS AND TRAININGS: Tehran Refinery, ISOMAX unit 1998

About me

Feasibility Studies, Basic Design, Steam Injection, Hydrocarbons, Heat Exchanger, concept selection, Detail Design, Gas Sweetening, Flare network design, Sulphur Removal, Process Flow Diagrams, detail design of compressor station and gas sweetening, P&ID, Sour Gas, PIPESIM, Petrochemicals, Petroleum, Quality Management Systems, heat exchanger design, Aspen Plus, HYSYS, UNISIM

Higher education (bachelor)

1999
AZAD University
Chemical engineering, Process, Bachelor of Science

Languages

PersianNative


EnglishC1 — Advanced


Citizenship, travel time to work

Citizenship: Iran

Permission to work: Russia

Desired travel time to work: Doesn't matter